Ilam gas turbine power plant , Ilam petrochemical complex consists of olefin, HDPE and utility units
Sub Contractor: Sadaf Teknik Endüstri
Location: Ilam, Iran
Scheme: EPC
Scope: Electromechanical equipment

Ilam petrochemical complex consists of olefin, HDPE and utility units. The total electrical power demand of this complex is around 4×30.22 MW (ISO condition) or about 4×21 MW (at worst case 42 oC , 60% RH) which is generated by minimum 4 (+1 future) gas turbine generators (GTGs). The MP steam (MPS) demand is 80 tons/hr would be produced by 2 heat recovery steam generation and HP Steam (HPS) demand is 40 tons/hr would be produced by fired boiler (FB) unit.