Karoun 3 hydro power plant , Iran Water & Power Resources

Iran Water & Power Resources Development Co. , Karoun 3 hydro power plant , sadaf teknik

Blog

Client

Iran Water & Power Resources Development Co.

Main Contractor: Farab
Location: Khuzestan, Iran
Scheme: PC
Scope: Electromechanical & hydromechanical equipment
Capacity: 2,000 MW (8 Units of 250 MW)
Type of power house: Underground
Average annual power generation: 4137 GWh

Karoun 3 hydro power plant

Main equipment:

  • Turbine: Vertical Francis, 187.5 rpm, 700 tons each
  • Generator: Synchronous type, 15.75 KV
  • Butterfly valve: 5.2 m inner outlet dimameter, 285 tons each unit
  • Governor: Digital type with digital backup governors, 75 bar
  • Busduct: 3 km generator busduct and 1 km SF6 400 KV
  • Transformer: Single phase step up transformers
  • Crane: Two power house main cranes, 300 tons each

Karoun 3 hydro power plant

Hydro Mechanical Equipment (12000 tons):

  • Service spillway: 2 radial gates and 6 stoplogs (550 tons), one gantry crane and hoist
  • servomotor
  • Orifice spillway: 2 radial and 2 sliding gates (1145 tons) with hoist servomotors and steel lining
  • (3200 tons)
  • Flow compensation outlet: 3 hollow cone valves (70 tons), 2 sliding and 2 bulkhead gate (100
  • tons), one gantry crane for bulkhead gate and one under-hung crane
  • Deck: 24 stoplogs (600 tons), 48 trash racks (460 tons) and one gantry crane
  • Gate gallery: One bulkhead and 4 sliding gates with hoist servomotors (300 tons) and one overhead crane
  • Tailrace: 12 stoplogs (360 tons) and one gantry crane