SDF Engineering/ Industrial and Supply

iran LNG gas treating unit

Client: Iran Liquefied Natural Gas Co. Sub contarctor: sadaf teknik endüstri Location: Bushehr, Iran Scheme: EPC

Blog

Client:

Iran Liquefied Natural Gas Co.


Sub contarctor: sadaf teknik endüstri
Location: Bushehr, Iran
Scheme: EPC

Iran LNG plant is located on the west coast of South Pars Gas Field Development, at Tombak. Two parallel LNG trains with a total production of more than 10 MMTPA of LNG will be installed. In addition to LNG, the plant will produce LPG, condensate and sulfur. The feed gas will be supplied from the South Pars gas producing area.

The NIOC LNG project has been divided into upstream and downstream developments.

iran LNG gas treating unit

The LNG Project upstream development, provides the following facilities:

Offshore platforms

Feed gas pipeline, slug catcher and condensate treatment
Condensate storage and loading (Condensate jetty top work) facilities. The LNG Project downstream development consists of the LNG plant, including storage and loading facilities and has been divided into the following packages.

LNG plant (Package I), which includes process, utilities and offsite areas, including loading facilities (top work only) and buildings. Client intends to divide Package I into the following packages:

 

  • Package I-A: Liquefaction units, comprising of unit 15, 16, 17 and 18.
  • Package I-B: Treating units (Lurgi sulfur management complex – LSMC) including unit 12, 13, 19 and unit 11 (Feed gas metering), Unit 14 (Mercury removal unit) and Unit 20 (LPG sweetening)
  • Package I-C: E-LNG including power station, electric motors and compressors
  • Package I-D: Utilities and off-sites
  • LNG storage sanks (Package II), which includes LNG and LPG tanks

Harbor and jetties (Package III), excluding loading facilities.
 